Construction Updates

Neosho Ridge Construction Update Oct. 20th to Oct. 26th

We will be working on the following this week throughout the project: • Grooming and maintaining public roads as needed• Off loading rebar at multiple sites • Continuing rock placement on access roads• Working on mud mats at various sites• Cement stabilization at multiple sites• Installing culverts at various sites

Neosho Ridge Construction Update Oct. 13th to Oct. 19th

The following will be performed in the southern most part and central part of the project: • Off loading rebar at various sites • Moving cranes site to site, slow wide loads• Continuing access road rock placement south of Highway 47• Working on mud mats at various sites• Cement stabilization at multiple sites• Road maintenance on all public roads south of Highway 47

Neosho Ridge Construction Update Oct. 6th to Oct. 12th

The following will be performed in the southern most part and central part of the project: • Base rock will be applied to access roads on Tuesday• Foundation excavations will start today• Rebar will be received today and again on Thursday• Cement stabilization will start today and continue throughout the week• Public roads will be repaired as needed

Neosho Ridge Construction Update Sep. 29th to Oct. 5th

We will be working on the following this week: • Weather pending, installing a culvert this weekend on 50th Road between Meade Road and Ness Road• Grooming and maintaining public roads as needed• Cement stabilization and stoning of access roads in the southeast corner of the project• Stripping topsoil on access roads in the southwest corner of the project• Installing access road culverts in the southwest corner of the project

Neosho Ridge Construction Update Sep. 25th to Sep. 28th

For the remainder of the week, we will be working on the following: Grooming and maintaining public roads: 80th Road from Harper Road to Lyon Road; Elk Road from 60th Road to 80th Road; 60th Road from Elk Road to Harper Road; 140th Road from Chase Road to Highway 169 Continue stripping topsoil and prepping access roads in the south central and south west areas of the project    

Neosho Ridge Construction Update Sep. 22th to Sep. 28th

Construction for the week of 09/22 to 09/28 is TO BE DETERMINED DUE TO THE WEATHER.

Neosho Ridge Construction Update Sep. 20th

ROAD CLOSURE UPDATE DUE TO THE WEATHER, 50TH ROAD BETWEEN MEADE ROAD AND NESS ROAD WILL NOT BE CLOSED TOMORROW (SAT. SEPTEMBER 21ST)

Neosho Ridge Construction Update Sep. 18th

ROAD CLOSURE 50th ROAD BETWEEN MEADE ROAD AND NESS ROAD WILL BE CLOSED ON SATURDAY, SEPTEMBER 21ST, FROM 8:00 A.M. TO 4:00 P.M.

Neosho Ridge Construction Update Sep. 15th to Sep. 21st

We will be working on the following for the week of 09/15 to 09/21: - Working public roads west of Elk Road to Chase Road and south from 120th Road to 140th Road- Continue stripping access roads and turbine sites in southeast work area and moving work west to continue stripping- Excavating foundations to rock in southeast work area then moving work west- Utility installation at laydown yard (Hwy 47 & Harper Road)- Replacing a culvert this Saturday, 09/21, on 50th Road (road closure details to come)

Neosho Ridge Construction Update Sep. 8th to Sep. 14th

- Working public roads west of Irving Road to Highway 169 and south from Highway 47 to 50th road- Continue stripping access roads and turbine sites in southeast work area and moving work west to continue stripping- Excavating foundations to rock in southeast work area then moving work west- Office trailer installation within laydown yard including applying civil infrastructures